    From the Pioneer in Underground and Surface Rock Reinforcement


    Capsules | Grout

    San Roque Multi-Purpose Project
    San Roque, Pangasinan.

    Construction of 200 meters high 345 megawatt hydropower and irrigation dam the biggest in Asia, 11th in the world.

    A Build-Operate-Transfer Project of : San Roque Power Corporation

    Project Contractor: Raytheon Ebasco Overseas, Ltd.

    Supra supply contracts: Supra-made epoxy-coated Rockbolts, Rock Anchors and Foscroc Resins.



    Umiray-Angat Tunnel Project
    Angat, Bulacan.

    Construction of 10,000 meters tunnel to flow the Umiray river to Angat Dam reservoir to augment water supply for Metro Manila

    Project Owner: Manila Waterworks & Sewerage System

    Project Contractor: Grandi Lavori Fincosit-SELI

    Supra supply contract: Cemextra Grout Capsules, Rockbolts, Steel Ribs, Quixet C50-P Set Accelerator, PE Fiber admixture.


    Casecnan Multi-Purpose Project
    Pantabangan, Nueva Ecija.

    Construction of 27,000 meters tunnel and dam, 150 megawatts power plant and irrigation facilities.

    A Build-Operate-Transfer Project of : California Energy Corporation

    Project Contractor: Hanbo Costruction & CP Casecnan Consortium

    Supra supply contract: Cemextra Grout Capsules, Rockbolts and Steel Ribs


    CALIRAYA-BOTOCAN-KALAYAAN PROJECT.

    Project Contractor: Sta. Clara Tunneling Co., Inc.

    Supra Supply Contract: CEMEXTRA Grout Capsules and Fosroc Resin Capsules for the access adit and shaft.

    Project Contractor: WHESSOE (Philippines) Inc.

    Supra Supply Contract: CEMEXTRA Grout Capsules for the Penstock Railing.


    SBMA Tipo Highway Tunnel.

    Project Owner: Bases Conversion Development Authority

    Project Contractor: AJM Construction

    Supra Supply Contract : Cemextra Grout Capsules, Rockbolts, and Steel Ribs


    Bakun Power Project
    Central Cordillera.

    Construction of 9,000 meters tunnel and 70 megawatts hydropower plant.

    A Build-Operate-Transfer Project of: Luzon Hydro Corporation

    Project Constractors: Transfield International & Sta Clara International Corp.

    Project Completed: Year 2000

    Supra supply contract: Cemextra Grout Capsules, Rockbolts, Steel Ribs